The construction committee was back at measuring the greens on Saturday December 21. The measurements(elevations) are needed to finalize the scope of work for the green rebuild project.

The image above shows elevations above and below average for the green area. The NW corner is close to 5 inches below and the East side of the green reaches a height of 2 inches above average. This translate into roughly a 7 inch difference.
Our goal is to make this graph all one colour. Preferably -0- difference across the green.
Below are images of the team putting down rope to create a grid pattern for taking scope measurements.

Roy, Ross, Doug and Jim

Rope Grid Pattern

Comments